NodeAffinity

com.coralogix.zio.k8s.model.core.v1.NodeAffinity
See theNodeAffinity companion object
case class NodeAffinity(preferredDuringSchedulingIgnoredDuringExecution: Optional[Vector[PreferredSchedulingTerm]], requiredDuringSchedulingIgnoredDuringExecution: Optional[NodeSelector])

Node affinity is a group of node affinity scheduling rules.

Value parameters

preferredDuringSchedulingIgnoredDuringExecution

The scheduler will prefer to schedule pods to nodes that satisfy the affinity expressions specified by this field, but it may choose a node that violates one or more of the expressions. The node that is most preferred is the one with the greatest sum of weights, i.e. for each node that meets all of the scheduling requirements (resource request, requiredDuringScheduling affinity expressions, etc.), compute a sum by iterating through the elements of this field and adding "weight" to the sum if the node matches the corresponding matchExpressions; the node(s) with the highest sum are the most preferred.

Attributes

Companion
object
Graph
Supertypes
trait Serializable
trait Product
trait Equals
class Object
trait Matchable
class Any
Show all

Members list

Value members

Concrete methods

The scheduler will prefer to schedule pods to nodes that satisfy the affinity expressions specified by this field, but it may choose a node that violates one or more of the expressions. The node that is most preferred is the one with the greatest sum of weights, i.e. for each node that meets all of the scheduling requirements (resource request, requiredDuringScheduling affinity expressions, etc.), compute a sum by iterating through the elements of this field and adding "weight" to the sum if the node matches the corresponding matchExpressions; the node(s) with the highest sum are the most preferred.

The scheduler will prefer to schedule pods to nodes that satisfy the affinity expressions specified by this field, but it may choose a node that violates one or more of the expressions. The node that is most preferred is the one with the greatest sum of weights, i.e. for each node that meets all of the scheduling requirements (resource request, requiredDuringScheduling affinity expressions, etc.), compute a sum by iterating through the elements of this field and adding "weight" to the sum if the node matches the corresponding matchExpressions; the node(s) with the highest sum are the most preferred.

If the field is not present, fails with com.coralogix.zio.k8s.client.UndefinedField.

Attributes

Gets requiredDuringSchedulingIgnoredDuringExecution.

Gets requiredDuringSchedulingIgnoredDuringExecution.

If the field is not present, fails with com.coralogix.zio.k8s.client.UndefinedField.

Attributes

Inherited methods

Attributes

Inherited from:
Product

Attributes

Inherited from:
Product